The Library is undertaking a refurbishment programme over the summer to replace all of the existing windows with upgraded, more energy-efficient triple glazing.

Noise disruption

As we are removing old windows from the Library and replacing them with new ones, there may be some noise in the building throughout the works. Noise is likely to be most disruptive on the floor being worked on, and the floor(s) closest to it.

We have planned the project so that the Library floors can remain open, however some areas may need to be closed temporarily to ensure everyone's safety. Please pay attention to any signs and instructions from staff. Access to silent study spaces, group study spaces and computers will be maintained throughout. 

Library services

Please be assured that throughout the project that we will continue to offer all Library services throughout the refurbishment, however, it may be that services will be provided from an alternative location.