Case studies
Ancillary service opportunities for renewable generation and storage
Against a background of reduced emissions from production of electricity, secure, stable operation of the GB system still needs to be maintained and the cost of balancing services has increased.
1 Oct 2024
Case studies
Online Circuit Breaker Gas Monitor Time Series Modelling
Sulphur Hexafluoride (SF6) escape from high voltage switch gear creates operational and environmental challenges. Asset owners are under increasing pressure to reduce emissions or face penalties. Monitoring data alone is not enough.